The hazard map identifies several weak points along the Hübbach stream. A lowering of the riverbed and a widening of the channel should ensure the necessary flow capacity while bank elevations are needed to handle backwater from the Töss. For these purposes, HOLINGER is adapting existing structures or constructing new ones.

 

Our tasks 

Support during all project phases.

Project management

Martin Böckli

Deputy Head of Hydraulic Engineering Division