At the Grand-Saconnex motorway junction near Palexpo and Geneva airport, road runoff was discharged untreated. But with more than 100 000 vehicles passing the area every day, road water treatment became essential. This has now been provided by a two-stage treatment plant with a sand filter followed by a reed-sand bed and a retention basin with a capacity of around 4 400 m3.