BIM to Reality
In five months, the fittings and installations of the "Weid" reservoir were renewed and the entire piping and remote control systems were replaced. Thanks to the phased approach and far-sighted planning, the plant remained in operation during the upgrade. The project was planned entirely in a BIM model and, for the first time, HOLINGER did not use any traditional paper plans on site.