HOLINGER tested BIM-to-Field for the first time with the construction of the micropollutant treatment stage at the Basel wastewater treatment plant. The new technology enables paperless workflows thanks to digital 3D models - with the exception of 2D formwork plans. Four large screens and tablets provide all the information needed for construction. Thus, it has been possible to eliminate the need for printed drawings.