HOLINGER was commissioned by Armasuisse to revise the General Drainage Plan (GDP) for the Chur armoury. The experts examined the condition of the drainage infrastructure, documented the special structures and defined measures for water protection. The new planning of measures ensures a cost-effective and targeted implementation of the GDP for the next twelve years.