Wastewater treatment: Control, measure, model

Windisch (AG) – In 2021, the Wasserschloss wastewater association implemented a filling and emptying measurement and control system for its external structures. Based on the measured data, a mass transport model will be developed to calculate the discharge loads. At the same time, HOLINGER is involved in the renovation and equipping of various structures. With the newly established overall management for the General Drainage Plan (GDP), organisational issues can be coordinated for the entire WWTP catchment area.

Our tasks

  • Evaluation of the measured data from the pilot year and implementation of the control concept 
  • Development of the control and mass transfer model in SIMBA 
  • Coordinating the overall GDP management for the Wasserschloss wastewater association 
  • Support for the renovation and equipment of various structures

Project management

[Translate to englisch:]
Sarah Aellen

Project Manager

[Translate to englisch:]
Michael Brögli

Project Manager Deputy

[Translate to englisch:]
Valters Krams

Rehabilitation/equipment of special structures